Metoda ključne putanje (CPM)

A schedule network analysis technique used to determine the amount of scheduling flexibility (the least amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project duration. Early start and finish date are calculated by means of a forward pass using a specified start date. Late start and finish dates are calculated by means of a backward pass, starting from a specified completion date, which sometimes is the project early finish date determined during the forward pass calculation.

0
Collect to Blossary

Member comments

You have to log in to post to discussions.

Terms in the News

Featured Terms

mesudj
  • 0

    Terms

  • 0

    Blossaries

  • 0

    Followers

Industry/Domain: Events Category: Awards

Zlatni globus

Priznanje za izvrsnost u filmu i televiziji, od strane Hollywood Foreign Press Association (HFPA). 68 ceremonija je održano do sada od početnog Golden ...

Contributor

Featured blossaries

Food poisoning

Category: Health   2 6 Terms

Lady Gaga Albums

Category: Entertainment   2 7 Terms