метода критичног пута (МКП)

A schedule network analysis technique used to determine the amount of scheduling flexibility (the least amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project duration. Early start and finish date are calculated by means of a forward pass using a specified start date. Late start and finish dates are calculated by means of a backward pass, starting from a specified completion date, which sometimes is the project early finish date determined during the forward pass calculation.

0
Collect to Blossary

Member comments

You have to log in to post to discussions.

Terms in the News

Featured Terms

sladjana milinkovic
  • 0

    Terms

  • 0

    Blossaries

  • 3

    Followers

Industry/Domain: Art history Category: Visual arts

биста

A sculpted or painted portrait that comprises the head, shoulders and upper arms of the subject.

Contributor

Featured blossaries

Michelangelo

Category: Arts   2 4 Terms

Wine

Category: Food   1 20 Terms