Home > Terms > Bosnian (BS) > Metoda ključne putanje (CPM)

Metoda ključne putanje (CPM)

A schedule network analysis technique used to determine the amount of scheduling flexibility (the least amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project duration. Early start and finish date are calculated by means of a forward pass using a specified start date. Late start and finish dates are calculated by means of a backward pass, starting from a specified completion date, which sometimes is the project early finish date determined during the forward pass calculation.

0
Collect to Blossary

Member comments

You have to log in to post to discussions.

Terms in the News

Featured Terms

ivysa
  • 0

    Terms

  • 0

    Blossaries

  • 4

    Followers

Industry/Domain: Natural environment Category: Water

biocid

A chemical that is toxic to microrganisms. Biocides are often used to eliminate bacteria and other single-cell organisms from water.

Contributor

Featured blossaries

Haunted Places Around The World

Category: Entertainment   65 10 Terms

Nerve Cell Related Diseases

Category: Health   1 5 Terms