Home > Terms > Bosnian (BS) > Metoda ključne putanje (CPM)
Metoda ključne putanje (CPM)
A schedule network analysis technique used to determine the amount of scheduling flexibility (the least amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project duration. Early start and finish date are calculated by means of a forward pass using a specified start date. Late start and finish dates are calculated by means of a backward pass, starting from a specified completion date, which sometimes is the project early finish date determined during the forward pass calculation.
0
0
Improve it
- Part of Speech: noun
- Synonym(s):
- Blossary:
- Industry/Domain: Business services
- Category: Project management
- Company: WSDOT
- Product:
- Acronym-Abbreviation:
Other Languages:
Member comments
Terms in the News
Featured Terms
Industry/Domain: Natural environment Category: Water
biocid
A chemical that is toxic to microrganisms. Biocides are often used to eliminate bacteria and other single-cell organisms from water.
Contributor
Featured blossaries
roozaarkaa
0
Terms
16
Blossaries
3
Followers
Haunted Places Around The World
Category: Entertainment 65 10 Terms
stanley soerianto
0
Terms
107
Blossaries
6
Followers
Nerve Cell Related Diseases
Category: Health 1 5 Terms
Browers Terms By Category
- Railroad(457)
- Train parts(12)
- Trains(2)
Railways(471) Terms
- Manufactured fibers(1805)
- Fabric(212)
- Sewing(201)
- Fibers & stitching(53)
Textiles(2271) Terms
- Health insurance(1657)
- Medicare & Medicaid(969)
- Life insurance(359)
- General insurance(50)
- Commercial insurance(4)
- Travel insurance(1)
Insurance(3040) Terms
- General art history(577)
- Visual arts(575)
- Renaissance(22)
Art history(1174) Terms
- General packaging(1147)
- Bag in box(76)